• +
    • 8708319b-5137-4d00-9744-fedfaf81ad3e.jpg

    Machine arc welding workstation project

    Category:


    Product features

    contact

    product details



    Production cycle: 360S/set
    Number of welds: 80
    Total length of weld: 6800mm

    Harbin built (military) northern special vehicle project: end frame welding project, single robot upside down form, double station, one station for lifting single-axis positioner with robot welding work, the second station is equipped with three-axis flip position machine to cooperate with the robot's welding work, walking mechanism with flip robot for double station switching.



    Harbin built (military) northern special vehicle project: end frame welding project

     

    Online consultation


    Copyright © 2023 Shenyang Weiding Robot Co., Ltd  Powered by 300.cn  shenyang.300.cn  SEO   license

    Service

    Hotline

    024-86152964

    银娱CEG优越会